Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TR 38.835  Word version:  18.0.1

Top   Top   Up   Prev   Next
1…   4…   5…   6   A   B…   B.1.2   B.1.3   B.1.4   B.1.5   B.1.6   B.1.7   B.1.8   B.1.9   B.1.10   B.2…   B.2.2   B.2.3   B.2.4   B.2.5   B.2.6   B.2.7   B.2.8   B.2.9   B.2.10   B.2.11   B.2.12   B.2.13   B.2.14   B.2.15   B.2.16   B.2.17   B.2.18   C…

 

B.2.9  Dynamic grant enhancement with XR-specific pre-schedulingp. 92

This clause captures evaluation results for dynamic grant enhancement with XR-specific pre-scheduling:
  • CATT evaluated the pre-configured XR-specific PDCCH monitoring cycle and monitoring window disassociated with C-DRX which is aligned with the periodic XR packet generation cycle. UE is allowed to monitor PDCCH for XR-specific PDCCH monitoring cycle at both DRX ON and OFF. CATT also evaluated multicarrier solutions with one carrier for XR service and the second carrier for eMBB service.
sourcedata row indexTdoc sourcePower saving schemeCDRX cycle (ms)ODT (ms)IAT (ms)Load H/L#UE /cellfloor (Capa­city)% of satis­fied UECapa­city gain (%)Mean PSG of all UEs (%)Mean PSG of satis­fied UEs (%)Addi­tional Assump­tions
CATT1R1-2211174Baseline: DG scheduling and UE always-on---H121295.8%0.0%0.0%-
CATT2R1-2211174DG scheduling with C-DRX16124H121290.0%-6.1%8.0%-
CATT3R1-2211174Semi-static C-DRX enhancement17/17/1684H12120.0%-100.0%25.5%-
CATT3R1-2211174Semi-static C-DRX enhancement17/17/1684H12120.0%-100.0%19.0%-Note1
CATT9R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 1: Pre-scheduling DG window (16, 12)16120H121290.0%-6.1%11.7%-
CATT9R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 1: Pre-scheduling DG window (16, 12)16120H121290.0%-0.0%3.8%-Note1
CATT10R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 2: Dynamic grant enhancement with XR-specific pre-scheduling with non-scheduling PDCCH skipping indication16120H121289.7%-7.0%22.4%-
CATT10R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 2: Dynamic grant enhancement with XR-specific pre-scheduling with non-scheduling PDCCH skipping indication16120H121289.7%-0.9%15.7%-Note1
CATT11R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 3: Pre-scheduling DG window (16, 12) with go-to-sleep16120H121290.0%-6.1%24.0%-
CATT11R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 3: Pre-scheduling DG window (16, 12) with go-to-sleep16120H121290.0%-0.0%17.4%-Note1
CATT12R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 4: Pre-scheduling DG window (16, 12) with PDCCH skipping and go-to-sleep16120H121289.7%-7.0%29.4%-
CATT12R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling scheme 4: Pre-scheduling DG window (16, 12) with PDCCH skipping and go-to-sleep16120H121289.7%-0.9%23.3%-Note1
NOTE 1:
PSG is calculated w.r.t. DG scheduling with C-DRX
Based on the evaluation results in Table B.2.9-1, the following observations can be made:
  • For FR1, DL only evaluation, InH, high load, VR 30Mbps traffic at 60fps with 10ms PDB, it is observed from CATT that:
    • dynamic grant enhancement with XR-specific pre-scheduling scheme could obtain:
      • mean power saving gain of 21.88% in the range of 11.7% to 29.40%
      • mean capacity gain of -6.55% in the range of -7.00% to -6.10%
    • semi-static C-DRX enhancement scheme with (17/17/16, 8, 4) as the performance reference obtains:
      • mean power saving gain of 22.50% in the range of 19.00% to 25.50%
      • mean capacity gain of -100%
    • DG scheduling with C-DRX as the performance reference obtains:
      • mean power saving gain of 15.05% in the range of 3.8% to 23.3%
      • mean capacity gain of -0.45%
sourcedata row indexTdoc sourcePower saving schemeCDRX cycle (ms)ODT (ms)IAT (ms)Load H/L#UE /cellfloor (Capa­city)% of satis­fied UECapa­city gain (%)Mean PSG of all UEs (%)Addi­tional Assump­tions
CATT1R1-2211174Baseline: DG scheduling and UE always-on---H121295.8%0.00%0.0%
CATT3R1-2211174Enhanced C-DRX16/17/1784H12120.0%-100.00%19.0%Note1,3
CATT27R1-2211174Enhanced C-DRX16/17/1784H1212--27.4%Note2,3
CATT12R1-2211174Dynamic grant enhancement with XR-specific pre-scheduling window (16, 12) with PDCCH skipping and go-to-sleep---H121289.2%-0.45%23.3%Note1,3
CATT26R1-2211174C-DRX for IM3201080H1212--87.2%Note2,3
NOTE 1:
first carrier for XR service
NOTE 2:
second carrier for eMBB service
NOTE 3:
baseline is DG scheduling with C-DRX(16, 12, 4) and Rel-17 PDCCH skipping scheme
Based on the evaluation results in Table B.2.9-2, the following observations can be made:
  • For FR1, DL only evaluation, InH, high load, multi-carrier, VR 30Mbps traffic at 60fps with 10ms PDB, it is observed from CATT that:
    • Dynamic grant enhancement with XR-specific pre-scheduling scheme for XR traffic carrier and IM traffic carrier provides:
      • mean power saving gain of 23.3% for the XR traffic carrier
      • mean power saving gain of 87.2% for the IM traffic carrier
      • mean capacity gain of -0.45% for the XR traffic carrier
    • enhanced C-DRX (16/17/17, 8, 4) as performance reference provides:
      • mean power saving gain of 19.0% for the XR traffic carrier
      • mean power saving gain of 27.4% for the IM traffic carrier
      • mean capacity gain of -100% for the XR traffic carrier
When XR and IM traffic transmitted in different carriers, the semi-static C-DRX enhancement scheme with (16/17/17, 8, 4) degrade 59.8% PSG of carrier with IM traffic compared with that of dynamic grant enhancement with XR-specific pre-scheduling scheme.
Up

Up   Top   ToC