Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 25.141
Word version: 18.0.0
1…
3…
6…
8…
A…
3
Definitions and abbreviations
4
General test conditions and declarations
5
Format and interpretation of tests
...
3
Definitions and abbreviations
p. 17
3.1
Definitions
p. 17
3.2
Symbols
|R11|
p. 19
3.3
Abbreviations
p. 20
3.4
Radio Frequency bands
p. 21
3.4.1
Frequency bands
p. 21
3.4.2
TX-RX frequency separation
p. 24
3.5
Channel arrangement
p. 25
3.5.1
Channel spacing
p. 25
3.5.2
Channel raster
p. 25
3.5.3
Channel number
p. 25
4
General test conditions and declarations
p. 28
4.1
Acceptable uncertainty of Test System
p. 28
4.1.1
Measurement of test environments
p. 28
4.1.2
Measurement of transmitter
p. 29
4.1.3
Measurement of receiver
p. 31
4.1.4
Measurement of performance requirement
p. 32
4.2
Test Tolerances (informative)
p. 33
4.2.1
Transmitter
p. 33
4.2.2
Receiver
p. 34
4.2.3
Performance requirement
p. 34
4.2.4
RRM measurements
p. 34
4.3
Interpretation of measurement results
p. 34
4.3A
Base station classes
p. 35
4.4
Test environments
p. 35
4.4.1
Normal test environment
p. 35
4.4.2
Extreme test environment
p. 36
4.4.2.1
Extreme temperature
p. 36
4.4.3
Vibration
p. 36
4.4.4
Power supply
p. 36
4.4.5
Definition of Additive White Gaussian Noise (AWGN) Interferer
p. 37
4.5
Selection of configurations for testing
p. 37
4.6
BS Configurations
p. 37
4.6.1
Receiver diversity
p. 37
4.6.2
Duplexers
p. 37
4.6.3
Power supply options
p. 38
4.6.4
Ancillary RF amplifiers
p. 38
4.6.5
BS using antenna arrays
p. 38
4.6.5.1
Receiver tests
p. 39
4.6.5.2
Transmitter tests
p. 39
4.6.6
Transmit diversity and MIMO transmission
|R5|
p. 40
4.6.7
BS with integrated Iuant BS modem
|R6|
p. 40
4.6.8
BS with Virtual Antenna Mapping
|R10|
p. 40
4.7
Regional requirements
p. 41
4.8
Specified frequency range
p. 43
4.8.1
Base Station RF Bandwidth position for non-single carrier testing
|R11|
p. 43
4.9
Applicability of requirements
|R9|
p. 44
4.10
Requirements for contiguous and non-contiguous spectrum
|R11|
p. 44
4.11
Manufacturer's declarations of regional and optional requirements
|R11|
p. 44
4.11.1
Operating band and frequency range
p. 44
4.11.2
Spurious emissions category
p. 44
4.11.3
Additional out of band emissions
p. 45
4.11.4
Co-existence with other systems
p. 45
4.11.5
Co-location with other base stations
p. 45
4.11.6
Manufacturer's declarations of supported RF configurations
p. 45
4.12
Test configuration for multi-carrier operations
|R11|
p. 46
4.12.1
UTC1: Contiguous spectrum operation test configuration
p. 47
4.12.1.1
UTC1 power allocation
p. 47
4.12.2
UTC2: Non-contiguous spectrum operation test configuration
p. 47
4.12.2.1
UTC2 power allocation
p. 47
4.12.3
Multi-band operation test configurations
p. 47
4.12.3.1
UTC3: Multi-band test configuration for full carrier allocation
p. 47
4.12.3.1.1
UTC3 power allocation
p. 48
4.12.3.2
UTC4: Multi-band test configuration with high PSD per carrier
p. 48
4.12.3.2.1
UTC4 power allocation
p. 49
4.12.4
Applicability of test configurations
p. 49
4.13
Requirements for BS capable of multi-band operation
|R11|
p. 51
5
Format and interpretation of tests
p. 52