Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TS 23.278  Word version:  18.0.0

Top   Top   Up   Prev   Next
1…   4…   4.4…   4.6…   4.6.1.1   4.6.1.2   4.6.1.3   4.6.1.4   4.6.1.5   4.6.1.6   4.7…   4.7.2…   4.7.3…   4.7.4…   4.7.5…   5…   6…

 

4.6.1.6  Process imcn_SSME_SSF and proceduresp. 126

One process is instantiated at the IM-SSF for each Call Gap message received from a gsmSCF.
This clause contains the SDL process for IM-SSF handling of the CallGap operation received from a gsmSCF.
The following Call Gap procedures specified in TS 23.078 Rel-99 shall also be applicable for IM-SSF. The IM-SSF shall take the role of the gsmSSF in the following:
  • Procedure Store_Call_Gap_Criteria;
  • Procedure Check_Gap_Criteria.
Copy of original 3GPP image for 3GPP TS 23.278, Fig. 4.35-1: Process imcn_SSME_SSF (sheet 1)
Figure 4.35-1: Process imcn_SSME_SSF (sheet 1)
(⇒ copy of original 3GPP image)
Up
Copy of original 3GPP image for 3GPP TS 23.278, Fig. 4.35-2: Process imcn_SSME_SSF (sheet 2)
Figure 4.35-2: Process imcn_SSME_SSF (sheet 2)
(⇒ copy of original 3GPP image)
Up

Up   Top   ToC