Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 51.010-1
Word version: 13.11.0
1…
2…
14…
20…
26…
26.7…
26.14…
27…
31…
40…
41…
42…
43…
45…
50…
52…
58a…
60…
80…
A1…
A1
Reference test methods
A3
Protocol implementation information
A4
Test SIM Parameters
A4A
Test USIM Parameters
A5
Test equipment
A6
E-OTD Accuracy Measurement Test Environment
A7
General rules for statistical testing
A9
GAN certificate
A10
Repeated SACCH Layer 1 Test Method:
$
Change history
A1
(Normative) Reference test methods
p. 5920
A1.1
General Conditions (GC)
p. 5920
A1.1.1
Outdoor test site and general arrangements for measurements involving the use of radiated fields (GC4)
p. 5920
A1.1.2
Anechoic shielded chamber (GC5)
p. 5920
A1.1.3
Temporary antenna connector (GC7)
p. 5921
A1.1.4
Temporary antenna connector characteristics
p. 5921
A1.1.5
Calibration of the temporary antenna connector
p. 5922
A1.1.5.1
Antenna radiation pattern
p. 5922
A1.1.5.2
Test range calibration
p. 5924
A1.1.5.3
Temporary antenna connector coupling factor
p. 5924
A1.1.6
Connection of devices with multiple antennae
p. 5925
A1.1.6.1
DARP phase 2 MS
p. 5925
A1.1.6.2
VAMOS III MS
p. 5925
A1.2
Normal and extreme Test Conditions (TC)
p. 5925
A1.2.1
Power sources and ambient temperatures (TC2)
p. 5925
A1.2.2
Normal test conditions (TC2.1)
p. 5926
A1.2.3
Extreme test conditions (TC2.2)
p. 5926
A1.2.4
Vibration requirements (TC4)
p. 5927
A2
Void
A3
Protocol implementation information
p. 5929
A3.1
Protocol Implementation Conformance Statement (PICS)
p. 5929
A3.1.1
LAPDm protocol (3GPP TS 04.05 and 04.06)
p. 5929
A3.1.1.1
Simplified protocol - 3GPP TS 04.06 clause 6
p. 5929
A3.1.1.2
Management of SAPI = 3 - 3GPP TS 04.11 subclause 2.3
p. 5929
A3.1.2
Mobility management
p. 5929
A3.1.2.1
IMSI detach initiation by the MS - 3GPP TS 04.08 / 3GPP TS 24.008 subclause 4.3.4.1
p. 5929
A3.1.2.2
IMSI detach completion by the MS - 3GPP TS 04.08 / 3GPP TS 24.008 subclause 4.3.4.3
p. 5929
A3.1.2.3
MM specific procedures - 3GPP TS 04.08 / 3GPP TS 24.008 subclauses 4.4 and 4.5.1.1
p. 5929
A3.1.2.4
Receiving an MM STATUS message - 3GPP TS 04.08 / 3GPP TS 24.008 subclause 4.6
p. 5929
A3.1.3
Call control
p. 5930
A3.1.3.1
Status enquiry procedures - 3GPP TS 04.08 / 3GPP TS 24.008 subclause 5.5.3.1
p. 5930
A3.1.3.2
Receiving a STATUS message by a CC entity - 3GPP TS 04.08 / 3GPP TS 24.008 subclause 5.5.3.2
p. 5930
A3.1.3.3
Called side compatibility checking - 3GPP TS 04.08 / 3GPP TS 24.008 clause B.3
p. 5930
A3.1.3.4
Disconnect on incoming call
p. 5930
A3.1.4
Layer 1
p. 5930
A3.1.4.1
Optional storage of BCCH carrier information - 3GPP TS 05.08 subclause 6.3
p. 5930
A3.1.5
Autocalling - (ref.: 3GPP TS 02.07, annex 1)
p. 5930
A3.1.6
Transient states
p. 5930
A3.2
Protocol Implementation Extra Information for Testing (PIXIT)
p. 5931
A3.2.0
Introduction
p. 5931
A3.2.1
Basic characteristics
p. 5931
A3.2.1.1
Type of antenna
p. 5931
A3.2.1.2
Power supply
p. 5932
A3.2.1.3
Power class of the MS
p. 5932
A3.2.1.4
Channel modes supported
p. 5932
A3.2.1.5
Teleservices supported
p. 5932
A3.2.1.6
Supplementary services supported
p. 5932
A3.2.1.7
Bearer services supported
p. 5932
A3.2.1.8
SIM removal
p. 5933
A3.2.1.9
Classmark
p. 5933
A3.2.1.10
Type of SIM/ME interface (ref. 3GPP TS 11.11 and 3GPP TS 11.12)
p. 5934
A3.2.1.11
Multislot class
p. 5934
A3.2.2
Man machine interface
p. 5934
A3.2.2.1
Mobile station features
p. 5934
A3.2.2.2
Short message service
p. 5935
A3.2.2.3
Supplementary services
p. 5935
A3.2.2.3.1
Call forwarding
p. 5935
A3.2.2.3.2
Call restriction
p. 5935
A3.2.2.3.3
Handling of (undefined) GSM supplementary services
p. 5936
A3.2.3
Electrical Man Machine Interface (EMMI)
p. 5936
A3.2.3.1
Methods supported for activation/deactivation of EMMI
p. 5936
A3.2.3.2
Transmission rate supported by the ME on the EMMI
p. 5936
A3.2.3.3
Layer 3 messages supported on the EMMI
p. 5936
A3.2.3.4
Keystroke sequence messages
p. 5936
A3.2.3.5
Internal malfunction detected messages
p. 5936
A3.2.4
Digital Audio Interface (DAI)
p. 5936
A3.2.5
Characteristics related to bearer services or teleservices
p. 5937
A3.2.5.1
Access interface
p. 5937
A3.2.5.2
Configuration of the MT
p. 5937
A3.2.5.3
Capability information
p. 5937
A3.2.5.4
Subaddress or DDI number
p. 5937
A3.2.5.5
User to user signalling
p. 5937
A3.2.5.6
Data call set-up and data call clearing
p. 5937
A3.2.5.7
Characteristics of non-transparent data services
p. 5938
A3.2.5.8
Possible ways of setting-up a call from either an external interface or internally
p. 5938
A3.2.5.9
Application layer causing automatic call termination
p. 5938
A3.2.5.10
Call re-establishment for MS not supporting speech
p. 5938
A3.2.6
International mobile station equipment identity
p. 5938
A3.2.7
Receiver intermediate frequencies
p. 5938
A3.2.8
Artificial ear
p. 5938
A4
Test SIM Parameters
p. 5942
A4.1
Introduction
p. 5942
A4.1.1
Definitions
p. 5942
A4.1.2
Definition of the test algorithm for authentication
p. 5942
A4.2
Default Parameters for the test SIM
p. 5942
A4.3
Default settings for the Elementary Files (EFs)
p. 5942
A4.3.1
EFICCID (ICC Identification)
p. 5943
A4.3.2
EFLP (Language preference)
p. 5943
A4.3.3
EFIMSI (IMSI)
p. 5943
A4.3.4
EFKc (Ciphering key Kc)
p. 5943
A4.3.5
EFPLMNsel (PLMN selector)
p. 5943
A4.3.6
EFHPLMN (HPLMN search period)
p. 5944
A4.3.7
EFACMmax (ACM maximum value)
p. 5944
A4.3.8
EFSST (SIM service table)
p. 5944
A4.3.9
EFACM (Accumulated call meter)
p. 5945
A4.3.10
EFPUCT (Price per unit and currency table)
p. 5945
A4.3.11
EFCBMI (Cell broadcast Message Identifier Selection)
p. 5945
A4.3.12
EFBCCH (Broadcast control channels)
p. 5945
A4.3.13
EFACC (Access control class)
p. 5946
A4.3.14
EFFPLMN (Forbidden PLMNs)
p. 5946
A4.3.15
EFLOCI (Location information)
p. 5946
A4.3.16
EFAD (Administrative data)
p. 5947
A4.3.17
EFPhase (Phase identification)
p. 5947
A4.3.18
EFADN (Abbreviated dialling numbers)
p. 5947
A4.3.19
EFFDN (Fixed dialling numbers)
p. 5947
A4.3.20
EFSMS (Short messages)
p. 5947
A4.3.21
EFCCP (Capability configuration parameters)
p. 5947
A4.3.22
EFMSISDN (MSISDN)
p. 5947
A4.3.23
EFSMSP (Short message service parameters)
p. 5947
A4.3.24
EFSMSS (SMS status)
p. 5947
A4.3.25
EFEXT1 (Extension 1)
p. 5948
A4.3.26
EFEXT2 (Extension 2)
p. 5948
A4.3.27
EFVGCS (Voice Group Call Service)
p. 5948
A4.3.28
EFVGCSS (Voice Group Call Service Status)
p. 5949
A4.3.29
EFVBS (Voice Broadcast Service)
p. 5949
A4.3.30
EFVBSS (Voice Broadcast Service Status)
p. 5950
A4.3.31
EFeMLPP (enhanced Multi Level Pre-emption and Priority)
p. 5950
A4.3.32
EFAAeM (Automatic Answer for eMLPP Service)
p. 5950
A4.3.33
EFKcGPRS (GPRS Ciphering key KcGPRS)
p. 5950
A4.3.34
EFLOCIGPRS (GPRS location information)
p. 5951
A4A
Test USIM Parameters
p. 5952
A5
Test equipment
p. 5953
A5.1
Introduction
p. 5953
A5.1.1
General
p. 5953
A5.1.2
Test equipment terms
p. 5953
A5.1.3
Confidence level
p. 5953
A5.2
Standard test signals
p. 5954
A5.3
SS functional requirements
p. 5954
A5.3.1
Level setting range
p. 5954
A5.3.2
Level Measurement / operation range
p. 5954
A5.3.3
MS power supply interface
p. 5955
A5.3.4
MS antenna interface
p. 5955
A5.3.4.1
Uplink receiver error
p. 5955
A5.3.4.2
Power and Power versus time measurements
p. 5955
A5.3.4.3
Wideband selective power measurement
p. 5958
A5.3.4.4
Inband selective power measurements
p. 5958
A5.3.4.5
Modulation accuracy and frequency error measurements
p. 5959
A5.3.4.6
RF delay measurements relative to nominal times
p. 5959
A5.3.4.7
The wanted signal or traffic channel of serving cell
p. 5959
A5.3.4.8
The first interfering signal or traffic channel of the first adjacent cell
p. 5961
A5.3.4.9
The second interfering signal
p. 5961
A5.3.4.10
BCCH carriers of serving and adjacent cells
p. 5962
A5.3.4.11
The wide frequency range signal
p. 5963
A5.3.4.12
The multipath fading function
p. 5964
A5.3.5
MS audio interface and DAI
p. 5964
A5.3.5.1
General uncertainties
p. 5964
A5.3.5.2
Analogue single test tone
p. 5964
A5.3.5.3
Delay measurement between Um and DAI
p. 5964
A5.4
SIM simulator functional requirements
p. 5964
A5.4.1
General
p. 5964
A5.4.2
Contacts C1, C2, C6, C7
p. 5965
A5.4.2.1
Default measurement / setting uncertainties
p. 5965
A5.4.2.2
Contact C1
p. 5965
A5.4.2.3
Contact C7
p. 5966
A5.4.3
Contact C3
p. 5967
A5.4.4
Definition of timing
p. 5967
A5.5
A-GPS and A-GNSS Minimum Performance Test System requirements
p. 5967
A5.5.1
Test System Uncertainty for A-GPS and A-GNSS Minimum Performance tests
p. 5967
A5.5.2
Test Parameter Relaxations (This clause is informative)
p. 5969
A5.5.3
Interpretation of measurement results
p. 5970
A5.5.4
Derivation of Test Requirements (This clause is informative)
p. 5971
A6
E-OTD Accuracy Measurement Test Environment
p. 5974
A6.1
Recommended Timing Accuracy Test Environment (Unassisted)
p. 5974
A6.2
Recommended Timing Accuracy Test Environment (Assisted)
p. 5975
A7
General rules for statistical testing
p. 5979
A7.1
Statistical testing of receiver performance
p. 5979
A7.1.1
Basics
p. 5979
A7.1.1.1
Definition of (error) events
p. 5979
A7.1.1.2
Test Method
p. 5979
A7.1.1.3
Test Criteria
p. 5979
A7.1.1.4
Calculation assumptions
p. 5980
A7.1.1.4.1
Statistical independence
p. 5980
A7.1.1.4.2
Applied formulas
p. 5980
A7.1.2
Definition of good pass fail decision
p. 5981
A7.1.3
Implementation
p. 5982
A7.1.3.1
Proceeding
p. 5982
A7.1.3.2
Limit lines
p. 5982
A7.1.4
Good balance between test time and statistical significance
p. 5985
A7.1.5
Minimum and maximum expected duration of tests
p. 5986
A7.2
Statistical testing of 2 D position error and TTFF for A-GPS and A-GNSS Minimum Performance test cases
p. 5986
A7.2.1
Test Method
p. 5986
A7.2.2
Error Ratio (ER)
p. 5987
A7.2.3
Test Design
p. 5987
A7.2.3.1
Confidence level
p. 5987
A7.2.3.2
Introduction: Supplier Risk versus Customer Risk
p. 5987
A7.2.3.3
Supplier Risk versus Customer Risk
p. 5988
A7.2.3.4
Introduction: Standard test versus early decision concept
p. 5988
A7.2.3.5
Standard test versus early decision concept
p. 5989
A7.2.3.6
Selectivity
p. 5989
A7.2.3.7
Design of the test
p. 5990
A7.2.4
Pass fail decision
p. 5991
A7.2.4.1
Numerical definition of the pass fail limits
p. 5991
A7.2.4.2
Pass fail decision rules
p. 5991
A7.2.4.3
Background information to the pass fail limits
p. 5992
A8
Void
A9
(Normative) GAN certificate
p. 5994
A9.1
Files relating to GAN certificate for testing
p. 5994
A9.1.1
Overview and usage of certificate files
p. 5994
A9.1.2
Privacy of private keys and usage of certificate
p. 5994
A10
Repeated SACCH Layer 1 Test Method:
p. 5995
A10.1
Details on Repeated SACCH Testing
p. 5995
$
Change history
p. 5998