Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.821
Word version: 9.1.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Study of UTRA Requirements
6
Study of E-UTRA requirements
7
Summary of required changes to UTRA specifications
8
Summary of required changes to E-UTRA specifications
9
Project plan
10
Open issues
A
UARFCN numbers
$
Change history
2
References
3
Definitions, symbols and abbreviations
Word‑p. 7
3.1
Definitions
3.2
Symbols
3.3
Abbreviations
4
Background
4.1
Task description
Word‑p. 8
5
Study of UTRA Requirements
5.1
Co-existing with other technologies
5.2
Technical conditions for UTRA
Word‑p. 9
5.2.1
Mandatory regulatory requirements:
5.2.2
Other technical conditions referred in Japan's regulations:
Word‑p. 12
5.3
Frequency bands and channel arrangement
Word‑p. 14
5.3.1
Frequency bands
5.3.2
TX-RX frequency separation
Word‑p. 15
5.3.3
Channel arrangement
5.3.3.1
Channel number
5.3.3.2
UARFCN
Word‑p. 16
5.4
Specific UE RF requirements
5.4.1
Spurious emissions
5.4.2
Reference sensitivity level
Word‑p. 17
5.4.2.1
Brief overview
5.4.2.2
Observation for UMTS
Word‑p. 18
5.4.2.3
Evaluation of the reference sensitivity of revised Band XI for UMTS
5.4.2.4
Proposal of reference sensitivity of revised Band XI and Band XXI for UMTS
Word‑p. 19
5.5
Specific BS RF requirements
5.5.1
Blocking requirements
6
Study of E-UTRA requirements
Word‑p. 20
6.1
Co-existing with other technologies
6.2
Technical conditions for E-UTRA
6.2.2
Other technical conditions referred in Japan's regulations:
Word‑p. 24
6.3
Operating bands and channel arrangement
Word‑p. 27
6.3.1
Operating bands
6.3.2
TX-RX frequency separation
6.3.3
Channel arrangement
6.3.3.1
Carrier frequency and EARFCN
6.3.4
Channel bandwidths per operating band
Word‑p. 28
6.4
Specific UE RF requirements
6.4.1
Maximum output power
6.4.2
Maximum output power with additional requirements
6.4.3
Spurious emissions
Word‑p. 29
6.4.3.1
Spurious emission band UE co-existence for LTE
6.4.3.2
Additional spurious emissions
Word‑p. 31
6.4.3.2.1
Relationship between Band 21 and additional spurious emission region
6.4.3.2.2
Outline of evaluation method
6.4.3.2.3
Evaluation results
Word‑p. 33
6.4.4
Reference sensitivity power level
Word‑p. 34
6.4.4.1
Reference sensitivity of revised Band 11 and Band 21 for LTE
6.4.4.2
Maximum uplink configuration of revised Band 11 and Band 21 for LTE
Word‑p. 35
6.4.4.2.1
Comparison of the current Band 11 and revised Band 11
6.4.4.2.3
Proposal of minimum uplink configuration
Word‑p. 36
6.5
Specific BS RF requirements
6.5.1
Blocking requirements
7
Summary of required changes to UTRA specifications
7.1
Required changes to TS 25.101
7.2
Required changes to TS 25.104
Word‑p. 37
7.3
Required changes to TS 25.113
Word‑p. 38
7.4
Required changes to TS 25.133
7.5
Required changes to TS 25.141
Word‑p. 39
7.6
Required changes to TS 34.124
Word‑p. 40
7.7
Required changes to TS 25.306
7.8
Required changes to TS 25.307
7.9
Required changes to TS 25.331
7.10
Required changes to TS 25.461
7.11
Required changes to TS 25.466
Word‑p. 41
8
Summary of required changes to E-UTRA specifications
8.1
Required changes to TS 36.101
8.2
Required changes to TS 36.104
8.3
Required changes to TS 36.113
Word‑p. 42
8.4
Required changes to TS 36.124
8.5
Required changes to TS 36.133
8.6
Required changes to TS 36.141
Word‑p. 43
8.7
Required changes to TS 36.331
8.8
New specification, TS 36.307
9
Project plan
Word‑p. 44
9.1
Schedule and Work Task Status
10
Open issues
A
UARFCN numbers
Word‑p. 45
A.1
List of UARFCN used for UTRA FDD bands
$
Change history
Word‑p. 48