Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 51.010-5
Word version: 10.19.0
0…
2…
2
References
3
Definitions and abbreviations
4
ATS Structure
5
Abstract test method and test configurations
6
Specific Test Suite Operations for InterRAT GERAN to UTRAN Handover testing
7
Generic Procedures for GERAN/LTE testing
A
Abstract Test Suites (ATS)
B
Partial IXIT proforma
C
Additional information to IXIT
D
PCTR Proforma
E
Guidance on test execution
$
Change history
2
References
p. 7
3
Definitions and abbreviations
p. 8
3.1
Definitions
p. 8
3.2
Abbreviations
p. 8
4
ATS Structure
p. 8
5
Abstract test method and test configurations
p. 8
6
Specific Test Suite Operations for InterRAT GERAN to UTRAN Handover testing
p. 8
7
Generic Procedures for GERAN/LTE testing
p. 8
7.1
GPRS Attach
p. 8
7.2
PDP Context 2 Activated
p. 8
7.3
U10 Active State
p. 9
A
(Normative) Abstract Test Suites (ATS)
p. 10
A.1
Version of specification
p. 10
A.2
IR_G ATS
p. 10
A.2.1
Void
A.2.2
The TTCN Machine Processable form (TTCN.MP)
p. 11
B
(Normative) Partial IXIT proforma
p. 12
B.0
Introduction
p. 12
B.1
Parameter values
p. 12
C
(Normative) Additional information to IXIT
p. 13
C.1
Identification Summary
p. 13
C.2
Abstract Test Suite Summary
p. 13
C.3
Test Laboratory
p. 13
C.3.1
Test Laboratory Identification
p. 13
C.3.2
Accreditation status of the test service
p. 14
C.3.3
Manager of Test Laboratory
p. 14
C.3.4
Contact person of Test Laboratory
p. 14
C.3.5
Means of Testing
p. 15
C.3.6
Instructions for Completion
p. 16
C.4
Client
p. 17
C.4.1
Client Identification
p. 17
C.4.2
Client Test Manager
p. 17
C.4.3
Client Contact person
p. 17
C.4.4
Test Facilities Required
p. 18
C.5
System Under Test
p. 19
C.5.1
SUT Information
p. 19
C.5.2
Limitations of the SUT
p. 20
C.5.3
Environmental Conditions
p. 21
C.6
Ancillary Protocols
p. 22
C.6.1
Ancillary Protocols 1
p. 22
C.6.2
Ancillary Protocols 2
p. 22
C.7
Protocol Layer Information for L3 of Mobile Station
p. 22
C.7.1
Information provided for test purposes by the MS supplier
p. 22
C.7.2
MMI information
p. 22
C.7.3
Test house specified parameters
p. 22
D
(Normative) PCTR Proforma
p. 23
E
Guidance on test execution
p. 23
E.1
InterRAT test execution
p. 23
$
Change history
p. 24