Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 48.018
Word version: 18.0.0
1…
4…
6…
8c…
10…
11…
6
User data and signalling procedures between RL and BSSGP SAPs
7
Signalling procedures between GMM SAPs
8
Signalling procedures between NM SAPs
8a
Signalling procedures between PFM SAPs
8b
Signalling Procedures between LCS SAPs
...
6
User data and signalling procedures between RL and BSSGP SAPs
p. 40
6.1
Downlink UNITDATA procedure
p. 40
6.1.1
Abnormal conditions
p. 43
6.2
Uplink UNITDATA procedure
p. 43
6.2.1
Abnormal conditions
p. 44
6.3
RA-CAPABILITY procedure
p. 44
6.3.1
Abnormal conditions
p. 44
6.4
Downlink MBMS-UNITDATA procedure
|R6|
p. 44
6.5
Uplink MBMS-UNITDATA procedure
|R6|
p. 45
6.6
Rerouting procedure in case of MOCN configuration for network sharing, Dedicated Core Networks or MS assisted Dedicated Core Network selection
|R10|
p. 45
6.6.1
General
p. 45
6.6.2
Reroute Indication
p. 46
6.6.3
Reroute complete
p. 48
6.6.4
Abnormal Conditions
p. 48
6.7
Rerouting procedure in case of GWCN configuration for network sharing
|R13|
p. 48
6.7.1
General
p. 48
6.7.2
Reroute indication
p. 49
6.7.3
Reroute complete
p. 50
6.7.4
Abnormal Conditions
p. 50
7
Signalling procedures between GMM SAPs
p. 50
7.1
Paging procedure
p. 50
7.1a
Paging procedure for Extended Coverage and eDRX
|R13|
p. 52
7.1a.1
Coverage Class and eDRX information available
p. 52
7.1a.2
Coverage Class information not available, eDRX information available
p. 52
7.1a.3
Coverage Class information available, eDRX information not available
p. 53
7.1b
Paging Procedure for Extended Coverage with Paging Indication
|R15|
p. 53
7.2
Radio Access Capability Update procedure
p. 53
7.2.1
Abnormal conditions
p. 53
7.3
Radio Status procedure
p. 54
7.4
SUSPEND procedure
p. 54
7.4.1
Abnormal conditions
p. 55
7.5
RESUME procedure
p. 55
7.5.1
Abnormal conditions
p. 55
7.6
MS Registration Enquiry
|R13|
p. 56
7.6.1
General
p. 56
7.6.2
Registration enquiry
p. 56
7.6.3
Registration response
p. 56
8
Signalling procedures between NM SAPs
p. 56
8.1
FLUSH-LL (logical link) procedure
p. 56
8.1.1
Abnormal Conditions
p. 58
8.2
Flow Control procedure
p. 58
8.2.1
General model of operation
p. 58
8.2.2
Mode of operation
p. 58
8.2.3
Flow Control of Traffic from an SGSN to BSS
p. 59
8.2.3.1
Control of the downlink throughput by the SGSN
p. 59
8.2.3.2
Flow Control Conformance Definition
p. 60
8.2.3.3
Response time within the SGSN to flow control messages
p. 62
8.2.3.4
Frequency of sending BVC or MS or PFC Flow Control PDUs
p. 62
8.2.3.5
FLOW-CONTROL PDUs
p. 62
8.2.3.6
Condition of Bmax for MS after Initial Flow-Control-BVC
p. 63
8.2.4
Flow Control of Uplink Traffic from a BSS to an SGSN
p. 63
8.3
BVC blocking and unblocking procedure
p. 63
8.3.1
PTP BVC
p. 63
8.3.2
Signalling BVC
p. 64
8.3.3
Abnormal Conditions
p. 64
8.4
BVC-RESET procedure
p. 65
8.4.1
Signalling BVC
p. 66
8.4.2
PTP BVC
p. 66
8.4.3
Abnormal Conditions
p. 66
8.5
Trace procedure
p. 66
8.6
Overload Control procedure
|R11|
p. 67
8.6.1
General
p. 67
8.6.2
Overload Operation
p. 67
8a
Signalling procedures between PFM SAPs
p. 67
8a.1
Create BSS PFC procedure
p. 67
8a.1.0
General
|R6|
p. 67
8a.1.0a
Allocation/Retention Priority handling
|R6|
p. 68
8a.1.1
Abnormal conditions
p. 70
8a.2
Modify BSS PFC procedure
p. 70
8a.2.1
Abnormal conditions
p. 70
8a.3
Delete BSS PFC procedure
p. 71
8a.4
PS Handover Required procedure
|R6|
p. 71
8a.4.1
Abnormal conditions
p. 73
8a.5
PS Handover Request procedure
|R6|
p. 73
8a.5.1
Abnormal conditions
p. 74
8a.6
PS Handover Complete procedure
|R6|
p. 75
8a.6.1
Abnormal conditions
p. 75
8a.7
PS Handover Cancel procedure
|R6|
p. 75
8a.7.1
Abnormal conditions
p. 76
8b
Signalling Procedures between LCS SAPs
|R5|
p. 77
8b.1
Location Procedure
p. 77
8b.1.1
Unsuccessful Operation
p. 78
8b.1.2
Abnormal Conditions
p. 78
8b.1.3
Overload
p. 78
8b.2
Position Command Procedure
p. 79
8b.2.1
Position Command
p. 79
8b.2.2
Position Response
p. 79
8b.2.3
Unsuccessful Operation
p. 79