Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 37.808
Word version: 12.0.0
1…
2…
2
References
3
Definitions and abbreviations
4
General
5
Scenarios for PIM
6
PIM generation from site infra-structure
7
PIM impact on receiver performance
8
Deployment aspects and counter measures for PIM
9
New PIM-related RF requirements
10
Testing aspects
11
Summary and conclusion
$
Change History
2
References
p. 5
3
Definitions and abbreviations
p. 5
3.1
Definitions
p. 5
3.2
Abbreviations
p. 5
4
General
p. 6
4.1
Work item objective
p. 6
5
Scenarios for PIM
p. 6
5.1
Site scenarios
p. 6
5.2
Single-band scenarios
p. 7
5.3
Multiband scenarios
p. 9
5.3.1
Dual band HSDPA, LTE inter-band CA and MB-MSR
p. 9
5.4
Other scenarios
p. 9
6
PIM generation from site infra-structure
p. 10
6.1
Mechanism for PIM generation
p. 10
6.1.1
Theoretical background for 3rd order Passive InterModulation (PIM)
p. 11
6.1.2
Theoretical bound for higher order non-linearity
p. 14
6.1.3
Theoretical background for spread spectrum signals
p. 14
6.2
Measurements
p. 15
6.2.1
Measurement configuration
p. 15
6.2.2
Two tone measurement results
p. 15
6.2.3
Spread spectrum measurement results
p. 18
6.2.4
Measurement results for IM5 and IM7
p. 19
6.2.5
Discussion of the measurement results
p. 20
7
PIM impact on receiver performance
p. 20
8
Deployment aspects and counter measures for PIM
p. 22
8.1
Impact of site infrastructure
p. 22
8.2
PIM counter measures
p. 23
8.3
Maintenance activities
p. 23
9
New PIM-related RF requirements
p. 24
10
Testing aspects
p. 25
10.1
Measurement of PIM products in networks
p. 25
10.1.1
External PIM test equipment
p. 25
10.1.2
Integrated PIM measurement
p. 26
11
Summary and conclusion
p. 26
$
Change History
p. 27