Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.833-1-41
Word version: 11.0.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Study of E-UTRA requirements
6
Summary of required changes to E-UTRA specifications
7
Project plan
$
Change History
2
References
p. 5
3
Definitions, symbols and abbreviations
p. 5
3.1
Definitions
p. 5
3.2
Symbols
p. 5
3.3
Abbreviations
p. 5
4
Background
p. 5
4.1
Task description
p. 6
4.2
Operating scenarios
p. 6
5
Study of E-UTRA requirements
p. 7
5.1
Operating bands and channel bandwidths
p. 7
5.1.1
Operating bands for CA
p. 7
5.1.2
Channel bandwidths for CA
p. 7
5.2
Supporting intra-band CA with 1 CC UL
p. 8
5.2.1
Motivation
p. 8
5.2.2
Implementation implications
p. 8
5.2.3
Release 10 specification support
p. 8
5.3
Specific UE RF requirements
p. 9
5.3.1
Spectrum emission mask
p. 9
5.3.2
Additional spectrum emission mask
p. 9
5.3.3
MPR for new 75 RB + 100 RB CC combination
p. 10
5.3.3.1
Contiguous RB transmission
p. 10
5.3.3.2
Multi-cluster RB transmission
p. 12
5.3.4
A-MPR
p. 13
5.3.4.1
Contiguous RB transmission
p. 13
5.3.4.2
Multi-cluster RB transmission
p. 19
5.3.5
Reference sensitivity power level
p. 23
5.3.6
In-band blocking
p. 24
5.3.7
Out-of-band blocking
p. 24
5.3.8
UE receiver requirements for new 75 RB + 100 RB CC combination
p. 25
5.3.8.1
Simulation set-up and assumptions
p. 25
5.3.8.2
Simulation results
p. 27
5.3.8.3
Summary
p. 28
5.4
Specific BS RF requirements
p. 28
5.5
Specific UE RRM requirements
p. 28
6
Summary of required changes to E-UTRA specifications
p. 29
6.1
Required changes to TS36.101
p. 29
6.2
Required changes to TS36.104
p. 29
6.3
Required changes to TS36.133
p. 29
6.4
Required changes to TS36.141
p. 29
6.5
Required changes to TS36.307
p. 30
6.6
Required changes to TS37.104
p. 30
6.7
Required changes to TS37.141
p. 30
7
Project plan
p. 30
7.1
Schedule and Work Task Status
p. 30
$
Change History
p. 32