Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.833-1-07
Word version: 11.0.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Band and channel arrangement
6
E-UTRA RF requirements for UE
7
E-UTRA RRM requirements for UE
8
E-UTRA RF requirements for BS
9
E-UTRA demodulation performance for BS and UE
10
Summary of required changes to E-UTRA specifications
11
Project plan
A
A-MPR simulation
$
Change history
2
References
p. 5
3
Definitions, symbols and abbreviations
p. 6
3.1
Definitions
p. 6
3.2
Symbols
p. 6
3.3
Abbreviations
p. 6
4
Background
p. 6
4.1
Task description
p. 7
4.2
Spectrum and regulatory review
p. 7
5
Band and channel arrangement
p. 7
5.1
CA operating bands
p. 7
5.2
CA channel bandwidth
p. 7
6
E-UTRA RF requirements for UE
p. 8
6.1
Transmitter characteristics
p. 8
6.1.1
UE maximum output power
p. 8
6.1.2
UE minimum output power
p. 8
6.1.3
UE Transmit OFF power
p. 9
6.2
Receiver characteristics
p. 9
6.2.1
UE Reference sensitivity
p. 9
6.2.2
In-band blocking
p. 10
6.2.3
Out-of-band blocking
p. 11
6.3
E-UTRA B7/B38 coexistence requirements
p. 11
6.3.1
A-MPR for band 7 CA to protect band 38
p. 12
6.3.2
A-MPR for multi-cluster transmission
p. 12
7
E-UTRA RRM requirements for UE
p. 13
8
E-UTRA RF requirements for BS
p. 13
8.1
Transmitter characteristics
p. 13
8.2
Receiver characteristics
p. 13
9
E-UTRA demodulation performance for BS and UE
p. 13
10
Summary of required changes to E-UTRA specifications
p. 13
10.1
Required changes to TS36.101
p. 13
10.2
Required changes to TS36.104
p. 14
10.3
Required changes to TS36.133
p. 14
10.4
Required changes to TS36.141
p. 14
10.5
Required changes to TS36.307
p. 14
10.6
Required changes to TS37.104
p. 15
10.7
Required changes to TS37.141
p. 15
11
Project plan
p. 15
11.1
Schedule and Work Task Status
p. 15
A
A-MPR simulation
p. 17
A.1
A-MPR for contiguous transmission
p. 17
A.1.1
Simulation campaign
p. 17
A.1.2
Simulation results
p. 18
A.2
A-MPR for multi-cluster transmission
p. 18
A.2.1
Simulation campaign
p. 18
$
Change history
p. 20