Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.821
Word version: 9.1.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Study of UTRA Requirements
6
Study of E-UTRA requirements
7
Summary of required changes to UTRA specifications
8
Summary of required changes to E-UTRA specifications
9
Project plan
10
Open issues
A
UARFCN numbers
$
Change history
2
References
p. 6
3
Definitions, symbols and abbreviations
p. 7
3.1
Definitions
p. 7
3.2
Symbols
p. 7
3.3
Abbreviations
p. 7
4
Background
p. 7
4.1
Task description
p. 8
5
Study of UTRA Requirements
p. 8
5.1
Co-existing with other technologies
p. 8
5.2
Technical conditions for UTRA
p. 9
5.2.1
Mandatory regulatory requirements:
p. 9
5.2.2
Other technical conditions referred in Japan's regulations:
p. 12
5.3
Frequency bands and channel arrangement
p. 14
5.3.1
Frequency bands
p. 14
5.3.2
TX-RX frequency separation
p. 15
5.3.3
Channel arrangement
p. 15
5.3.3.1
Channel number
p. 15
5.3.3.2
UARFCN
p. 16
5.4
Specific UE RF requirements
p. 16
5.4.1
Spurious emissions
p. 16
5.4.2
Reference sensitivity level
p. 17
5.4.2.1
Brief overview
p. 17
5.4.2.2
Observation for UMTS
p. 18
5.4.2.3
Evaluation of the reference sensitivity of revised Band XI for UMTS
p. 18
5.4.2.4
Proposal of reference sensitivity of revised Band XI and Band XXI for UMTS
p. 19
5.5
Specific BS RF requirements
p. 19
5.5.1
Blocking requirements
p. 19
6
Study of E-UTRA requirements
p. 20
6.1
Co-existing with other technologies
p. 20
6.2
Technical conditions for E-UTRA
p. 20
6.2.2
Other technical conditions referred in Japan's regulations:
p. 24
6.3
Operating bands and channel arrangement
p. 27
6.3.1
Operating bands
p. 27
6.3.2
TX-RX frequency separation
p. 27
6.3.3
Channel arrangement
p. 27
6.3.3.1
Carrier frequency and EARFCN
p. 27
6.3.4
Channel bandwidths per operating band
p. 28
6.4
Specific UE RF requirements
p. 28
6.4.1
Maximum output power
p. 28
6.4.2
Maximum output power with additional requirements
p. 28
6.4.3
Spurious emissions
p. 29
6.4.3.1
Spurious emission band UE co-existence for LTE
p. 29
6.4.3.2
Additional spurious emissions
p. 31
6.4.3.2.1
Relationship between Band 21 and additional spurious emission region
p. 31
6.4.3.2.2
Outline of evaluation method
p. 31
6.4.3.2.3
Evaluation results
p. 33
6.4.4
Reference sensitivity power level
p. 34
6.4.4.1
Reference sensitivity of revised Band 11 and Band 21 for LTE
p. 34
6.4.4.2
Maximum uplink configuration of revised Band 11 and Band 21 for LTE
p. 35
6.4.4.2.1
Comparison of the current Band 11 and revised Band 11
p. 35
6.4.4.2.3
Proposal of minimum uplink configuration
p. 36
6.5
Specific BS RF requirements
p. 36
6.5.1
Blocking requirements
p. 36
7
Summary of required changes to UTRA specifications
p. 36
7.1
Required changes to TS 25.101
p. 36
7.2
Required changes to TS 25.104
p. 37
7.3
Required changes to TS 25.113
p. 38
7.4
Required changes to TS 25.133
p. 38
7.5
Required changes to TS 25.141
p. 39
7.6
Required changes to TS 34.124
p. 40
7.7
Required changes to TS 25.306
p. 40
7.8
Required changes to TS 25.307
p. 40
7.9
Required changes to TS 25.331
p. 40
7.10
Required changes to TS 25.461
p. 40
7.11
Required changes to TS 25.466
p. 41
8
Summary of required changes to E-UTRA specifications
p. 41
8.1
Required changes to TS 36.101
p. 41
8.2
Required changes to TS 36.104
p. 41
8.3
Required changes to TS 36.113
p. 42
8.4
Required changes to TS 36.124
p. 42
8.5
Required changes to TS 36.133
p. 42
8.6
Required changes to TS 36.141
p. 43
8.7
Required changes to TS 36.331
p. 43
8.8
New specification, TS 36.307
p. 43
9
Project plan
p. 44
9.1
Schedule and Work Task Status
p. 44
10
Open issues
p. 44
A
UARFCN numbers
p. 45
A.1
List of UARFCN used for UTRA FDD bands
p. 45
$
Change history
p. 48