Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.813
Word version: 10.1.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Study of E-UTRA requirements
6
Summary of required changes to E-UTRA specifications
7
Project plan
8
Open issues
A
Configuration Example
$
Change history
2
References
p. 6
3
Definitions, symbols and abbreviations
p. 7
3.1
Definitions
p. 7
3.2
Symbols
p. 7
3.3
Abbreviations
p. 7
4
Background
p. 7
4.1
Task description
p. 8
4.2
Regulatory and Emissions Background
p. 8
4.2.1
Intra-L-Band Geographic Coordination Requirements
p. 9
4.2.1.1
Search & Rescue (SAR) Protection
p. 9
4.2.1.2
Radio Astronomy System (RAS) Protection
p. 10
4.2.2
eNodeB Out-Of-Band-Emissions (OOBE) to non-3GPP Bands outside L-band
p. 10
4.2.2.1
Defense/Aeronautical (MAT) Protection
p. 10
4.2.2.2
RNSS (GPS) Band Protection
p. 10
4.2.3
UE Emissions Requirements
p. 11
4.2.4
Overload Characteristics of GPS Receivers in Proximity to LTE Band 24 eNBs
p. 11
4.2.4.1
Summary of Study Results
p. 11
5
Study of E-UTRA requirements
p. 14
5.1
Operating band and channel arrangement
p. 14
5.1.1
Operating bands
p. 14
5.1.2
Channel bandwidths per operating band
p. 15
5.1.3
Carrier frequency and EARFCN
p. 15
5.1.4
TX-RX frequency separation
p. 15
5.1.5
Band Release Independence
p. 15
5.2
Specific UE RF requirements
p. 16
5.2.1
Maximum Output Power
p. 16
5.2.2
Maximum Output Power with additional Requirements
p. 16
5.2.3
Spurious Emissions
p. 17
5.2.4
Reference Sensitivity Power Level
p. 19
5.3
Specific BS RF requirements
p. 20
5.3.1
Operating band unwanted emissions
p. 20
5.3.2
Additional spurious emissions requirements
p. 22
5.3.3
Co-location with other base stations
p. 23
5.3.4
General blocking requirement
p. 24
5.3.5
Blocking requirement for co-location with other base stations
p. 24
5.3.6
UTRAN requirements
p. 24
5.3.6.1
Required changes to 3GPP TS 25.461
p. 24
5.3.6.2
Required changes to 3GPP TS 25.466
p. 24
6
Summary of required changes to E-UTRA specifications
p. 25
6.1
Required changes to 3GPP TS 36.101
p. 25
6.2
Required changes to 3GPP TS 36.104
p. 25
6.3
Required changes to 3GPP TS 36.113
p. 26
6.4
Required changes to 3GPP TS 36.124
p. 26
6.5
Required changes to 3GPP TS 36.133
p. 26
6.6
Required changes to 3GPP TS 36.141
p. 27
6.7
Required changes to 3GPP TS 36.307
p. 28
6.8
Required changes to 3GPP TS 25.461
p. 28
6.9
Required changes to 3GPP TS 25.466
p. 28
6.10
Required changes to 3GPP TS 25.101
p. 28
6.11
Required changes to 3GPP TS 25.104
p. 28
6.12
Required changes to 3GPP TS 25.141
p. 29
6.13
Required changes to 3GPP TS 37.104
p. 29
6.14
Required changes to 3GPP TS 37.141
p. 29
7
Project plan
p. 30
7.1
Schedule and Work Task Status
p. 30
8
Open issues
p. 30
A
Configuration Example
p. 31
$
Change history
p. 33