Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.800
Word version: 9.0.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Study of UTRA Requirements
6
Study of E-UTRA requirements
7
Summary of required changes to UTRA specifications
8
Summary of required changes to E-UTRA specifications
9
Project plan
10
Open issues
A
UARFCN numbers
$
Change history
2
References
p. 6
3
Definitions, symbols and abbreviations
p. 7
3.1
Definitions
p. 7
3.2
Symbols
p. 7
3.3
Abbreviations
p. 7
4
Background
p. 7
4.1
Task description
p. 7
5
Study of UTRA Requirements
p. 8
5.1
Co-existing with other technologies
p. 8
5.2
Technical conditions for UTRA
p. 8
5.3
Frequency bands and channel arrangement
p. 8
5.3.1
Frequency bands
p. 8
5.3.2
TX-RX frequency separation
p. 8
5.3.3
Channel arrangement
p. 9
5.3.3.1
Channel number
p. 9
5.3.3.2
UARFCN
p. 9
5.4
Specific UE RF requirements
p. 9
5.4.1
Spurious emissions
p. 9
5.4.1.1
General spurious emissions requirements
p. 10
5.4.1.2
Additional spurious emissions requirements
p. 10
5.4.2
Reference sensitivity level
p. 10
5.4.2.1
Direction of investigation for UMTS
p. 10
5.4.2.2
Evaluation of the reference sensitivity of Band XIX for UMTS.
p. 10
5.4.2.3
Proposal of reference sensitivity of Band XIX for UMTS
p. 12
5.4.3
Blocking characteristics
p. 12
5.5
Specific signalling requirements considering dual band operation
p. 12
6
Study of E-UTRA requirements
p. 13
6.1
Co-existing with other technologies
p. 13
6.2
Technical conditions for E-UTRA
p. 13
6.2.1
Mandatory regulatory requirements:
p. 13
6.2.2
Other technical conditions referred in Japan's regulations:
p. 17
6.3
Operating bands and channel arrangement
p. 20
6.3.1
Operating bands
p. 20
6.3.2
TX-RX frequency separation
p. 20
6.3.3
Channel arrangement
p. 20
6.3.3.1
Carrier frequency and EARFCN
p. 20
6.3.4
Channel bandwidths per operating band
p. 21
6.4
Specific UE RF requirements
p. 21
6.4.1
Maximum output power with additional requirements
p. 21
6.4.1.1
Outline of evaluation method
p. 21
6.4.1.2
Outline of Evaluation results
p. 22
6.4.1.2.1
Brief overview of measurement results
p. 22
6.4.1.2.2
for 5MHz Channel bandwidth cases
p. 23
6.4.1.2.3
for 10MHz and 15MHz Channel bandwidth cases
p. 23
6.4.1.3
Summary of results
p. 24
6.4.2
Spurious emissions
p. 24
6.4.2.1
Minimum requirements
p. 25
6.4.2.2
Spurious emission band UE co-existence
p. 25
6.4.2.3
Additional spurious emissions
p. 25
6.4.3
Reference sensitivity power level
p. 26
6.4.3.1
Direction of investigation for LTE
p. 26
6.4.3.2
Evaluation of the reference sensitivity of Band 18 and Band 19 for LTE
p. 26
6.4.3.3
Proposal of reference sensitivity of Band 18 and Band 19 for LTE
p. 26
6.4.3.4
Evaluation of maximum uplink configuration of Band 18 and Band 19 for LTE
p. 26
6.4.4
Blocking characteristics
p. 27
6.4.4.1
In band blocking
p. 27
6.4.4.2
Out of band blocking
p. 27
6.5
E-UTRA Band 6 handling
p. 27
7
Summary of required changes to UTRA specifications
p. 27
7.1
Required changes to TS 25.101
p. 27
7.2
Required changes to TS 25.104
p. 28
7.3
Required changes to TS 25.113
p. 28
7.4
Required changes to TS 25.133
p. 29
7.5
Required changes to TS 25.141
p. 29
7.6
Required changes to TS 34.124
p. 30
7.7
Required changes to TS 25.306
p. 30
7.8
Required changes to TS 25.307
p. 30
7.9
Required changes to TS 25.331
p. 30
7.10
Required changes to TS 25.461
p. 30
7.11
Required changes to TS 25.466
p. 31
7.12
Required changes to TS 34.108
p. 31
7.13
Required changes to TS 34.121-1, TS34.121-2
p. 31
7.14
Required changes to TS 34.123-1, TS 34.123-2, TS 34.123-3
p. 32
8
Summary of required changes to E-UTRA specifications
p. 32
8.1
Required changes to TS 36.101
p. 32
8.2
Required changes to TS 36.104
p. 33
8.3
Required changes to TS 36.113
p. 33
8.4
Required changes to TS 36.124
p. 33
8.5
Required changes to TS 36.133
p. 34
8.6
Required changes to TS 36.141
p. 34
8.7
Required changes to TS 36.331
p. 34
8.8
Required changes to TS 36.508
p. 34
8.9
Required changes to TS 36.521-1, TS 36.521-2, TS 36.521-3
p. 35
8.10
Required changes to TS 36.523-1, TS 36.523-2, TS 36.523-3
p. 35
9
Project plan
p. 36
9.1
Schedule and Work Task Status
p. 36
10
Open issues
p. 36
A
UARFCN numbers
p. 37
A.1
List of UARFCN used for UTRA FDD bands
p. 37
$
Change history
p. 40