Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TR 36.761  Word version:  15.0.0

Top   Top   None   None   Next
1…   2…
1 Scope
...

 

1  ScopeWord‑p. 5

The present document is a technical report for the work item of Extended-Band 12 new E-UTRA Band, including in the first part, as stated in the WID [2], the outcome of the study phase looking at the co-existence impacts of the removal of the 1MHz guard between E block and A block (728-729 MHz).

Up   Top   ToC