Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 25.871
Word version: 11.0.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Design Objective for UL MIMO
5
Physical Layer Structure Alternatives for UL MIMO
6
MAC layer structure alternatives for UL MIMO
7
Performance Evaluation Methodology
8
Performance evaluation results
9
Cubic metric evaluation
10
Impact on implementation
11
Impact on specifications
12
Conclusion
$
Change history
2
References
p. 6
3
Definitions, symbols and abbreviations
p. 7
3.1
Definitions
p. 7
3.2
Symbols
p. 7
3.3
Abbreviations
p. 7
4
Design Objective for UL MIMO
p. 7
5
Physical Layer Structure Alternatives for UL MIMO
p. 8
5.1
Signalling Requirements to support UL MIMO
p. 8
5.2
Physical Channels
p. 9
5.2.1
Introduction of Precoding in the UE transmitter
p. 9
5.2.2
Introduction of Uplink Physical Channels
p. 9
5.2.2.1
Secondary DPCCH (S-DPCCH)
p. 9
5.2.2.2
Secondary E-DPCCH (S-E-DPCCH)
p. 9
5.2.2.3
Secondary E- DPDCH (S-E-DPDCH)
p. 10
5.2.2.4
Uplink Physical Channel Configuration
p. 10
5.2.3
Introduction of Downlink Physical Channels
p. 11
5.2.3.1
DL Feedback of UL Precoding Information
p. 11
5.2.3.2
DL Feedback of HARQ acknowledgement indicators
p. 11
5.2.3.3
DL Feedback of relative grants for each stream on E-RGCH
p. 12
5.3
Channel Coding and Multiplexing
p. 12
5.3.1
E-DCH TTI Configuration
p. 12
5.3.2
E-DCH Coding
p. 12
5.3.2.1
Two HARQ process per TTI, Single E-DCH transport channel
p. 12
5.3.2.2
Single HARQ process per TTI, Single E-DCH transport channel
p. 13
5.3.3
E-DPCCH
p. 14
5.3.4
E-AGCH
p. 15
5.4
Physical Layer Procedures
p. 15
5.4.1
Uplink power control
p. 16
6
MAC layer structure alternatives for UL MIMO
p. 16
7
Performance Evaluation Methodology
p. 17
7.1
Simulation assumptions
p. 17
7.2
Performance evaluation metrics
p. 19
8
Performance evaluation results
p. 20
8.1
Dual TB Transmission Scheme (Option II)
p. 20
8.2
Dual TB interleaved transmission scheme (Option III)
p. 28
8.3
Single TB transmission scheme (Option I)
p. 29
9
Cubic metric evaluation
p. 30
9.1
Studied codebook
p. 31
9.2
Simulation methodology
p. 32
9.3
Studied simulation cases
p. 32
9.4
Results
p. 32
10
Impact on implementation
p. 33
10.1
Impact on UE implementation
p. 33
10.1.1
Impact on UE transmitter
p. 33
10.1.2
Impact on UE receiver
p. 35
10.2
Impact on UTRAN Implementation
p. 37
11
Impact on specifications
p. 37
11.1
Impact on 25.1xx Technical Specifications
p. 38
11.1.1
TS 25.101
p. 38
11.1.2
TS 25.104
p. 38
11.2
Impact on 25.2xx Technical Specifications
p. 38
11.2.1
TS 25.201
p. 38
11.2.2
TS 25.211
p. 38
11.2.3
TS 25.212
p. 39
11.2.3.1
Coding for E-DPCCH and/or S-E-DPCCH
p. 39
11.2.3.2
Coding for E-AGCH
p. 39
11.2.4
TS 25.213
p. 39
11.2.5
TS 25.214
p. 39
11.2.6
TS 25.215
p. 39
11.3
Impact on 25.3xx Technical Specifications
p. 40
11.3.1
TS 25.306
p. 40
11.3.2
TS 25.319
p. 40
11.3.4
TS 25.321
p. 40
11.3.5
TS 25.322
p. 40
11.3.6
TS 25.331
p. 40
11.4
Impact on 25.4xx Technical Specifications
p. 40
11.4.1
TS 25.423
p. 40
11.4.2
TS 25.433
p. 41
12
Conclusion
p. 41
$
Change history
p. 42