Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 23.858
Word version: 13.0.0
1…
4…
4
Key Issue 1: Service/Application Monitored in more than one monitoring group
5
Key Issue 2: Disabling Service/Application Usage Monitoring
6
Key Issue 3: Exclude Usage of a Service/Application from IP-CAN session/TDF session Usage
7
Key Issue 4: Usage Monitoring Optimization
8
Key Issue 5: Usage Monitoring for Subscriber Group
9
Key Issue 6: Time based Usage Monitoring
$
Change history
4
Key Issue 1: Service/Application Monitored in more than one monitoring group
p. 7
4.1
Description
p. 7
4.2
Use Cases
p. 7
4.2.1
Descriptions
p. 7
4.2.2
Pre-conditions
p. 7
4.2.3
Service Flows
p. 7
4.2.4
Post-conditions
p. 7
4.2.5
Requirements
p. 7
4.3
Alternative Solutions
p. 7
4.3.1
Alternative Solution 1: Multiple monitoring key within a PCC/ADC Rule
p. 8
4.3.2
Alternative Solution 2: One monitoring key within a PCC/ADC Rule
p. 8
4.3.2.1
General Description
p. 8
4.3.2.2
A service/application belongs to more than one monitoring group
p. 8
4.4
Evaluation
p. 8
4.4.1
Analysis for Alternative Solution 1
p. 8
4.4.2
Analysis for Alternative Solution 2
p. 8
4.4.3
Comparison
p. 9
4.5
Conclusion
p. 9
5
Key Issue 2: Disabling Service/Application Usage Monitoring
p. 9
5.1
Description
p. 9
5.2
Use Cases
p. 9
5.2.1
Descriptions
p. 9
5.2.2
Pre-conditions
p. 9
5.2.3
Service Flows
p. 10
5.2.4
Post-conditions
p. 10
5.2.5
Requirements
p. 10
5.3
Alternative Solutions
p. 10
5.3.1
Alternative Solution 1: Indication based Activation/Deactivation
p. 10
5.3.2
Alternative Solution 2: PCC/ADC Rules Replacement
p. 10
5.3.3
Alternative Solution 3: Monitoring Key Modification
p. 11
5.4
Evaluation
p. 11
5.5
Conclusion
p. 11
6
Key Issue 3: Exclude Usage of a Service/Application from IP-CAN session/TDF session Usage
p. 11
6.1
Description
p. 12
6.2
Use Cases
p. 12
6.2.1
Descriptions
p. 12
6.2.2
Pre-conditions
p. 12
6.2.3
Service Flows
p. 12
6.2.4
Post-conditions
p. 12
6.2.5
Requirements
p. 12
6.3
Alternative Solutions
p. 13
6.3.1
Alternative Solution 1: PCEF/TDF based counting with usage monitoring interface enhancements
p. 13
6.3.2
Alternative Solution 2: Using new ADC/ PCC Rules by applying existing standardized methods
p. 13
6.3.3
Alternative Solution 3: PCRF based counting
p. 13
6.3.4
Alternative Solution 4: PCEF/TDF based counting by re-using key issue 1 solution "Multiple Monitoring key within a PCC/ADC Rule"
p. 14
6.4
Evaluation
p. 14
6.5
Conclusion
p. 14
7
Key Issue 4: Usage Monitoring Optimization
p. 14
7.1
Description
p. 14
7.2
Use Cases
p. 14
7.2.1
Description
p. 14
7.2.2
Pre-conditions
p. 14
7.2.3
Service Flows
p. 15
7.2.4
Post-conditions
p. 15
7.2.5
Requirements
p. 15
7.3
Alternative Solutions
p. 15
7.3.1
Alternative Solution ...
p. 15
7.4
Evaluation
p. 15
7.5
Conclusion
p. 15
8
Key Issue 5: Usage Monitoring for Subscriber Group
p. 15
8.1
Description
p. 15
8.2
Use Cases
p. 15
8.2.1
Descriptions
p. 15
8.2.2
Pre-conditions
p. 15
8.2.3
Service Flows
p. 16
8.2.4
Post-conditions
p. 17
8.2.5
Requirements
p. 17
8.3
Alternative Solutions
p. 17
8.3.1
Alternative Solution 1 - correlation at the SPR/UDR
p. 17
8.3.1.1
Terminologies
p. 17
8.3.1.2
Information flow
p. 18
8.3.2
Alternative Solution 2 - PCRF based solution
p. 19
8.3.2.1
Terminology
p. 19
8.3.2.2
Assumptions
p. 19
8.3.2.3
Solution Description
p. 19
8.3.2.4
Group-PCRF selection
p. 21
8.3.2.4.1
Option 1: SPR/UDR-method
p. 21
8.3.2.4.2
Option 2: DRA-method
p. 23
8.3.2.5
Functionality description of the Network entity and interface
p. 26
8.4
Evaluation
p. 27
8.5
Conclusion
p. 27
9
Key Issue 6: Time based Usage Monitoring
p. 27
9.1
Description
p. 27
9.2
Use Cases
p. 27
9.2.1
Descriptions
p. 27
9.2.2
Pre-conditions
p. 27
9.2.3
Service Flows
p. 27
9.2.4
Post-conditions
p. 28
9.2.5
Requirements
p. 28
9.3
Alternative Solutions
p. 28
9.3.1
Alternative Solution 1: Introduction of time based units
p. 28
9.4
Evaluation
p. 28
9.5
Conclusion
p. 28
$
Change history
p. 29