Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 23.750
Word version: 14.0.0
1…
5…
5
Key Issues
6
Solutions
7
Overall Evaluation
8
Conclusions
$
Change History
5
Key Issues
p. 7
5.1
Key Issue 1 - How to improve VoLTE call setup success rate and minimize the negative impact on user experience for VoLTE subscriber in LTE with bad coverage overlaid with 2/3G CS coverage
p. 7
5.1.1
Description
p. 7
6
Solutions
p. 8
6.1
Solution #1 to key issue 1: VoLTE→(e)CSFB
p. 8
6.1.1
Description
p. 8
6.1.2
Mobile Originating call flows
p. 9
6.1.3
Mobile Terminated call flows
p. 12
6.1.4
Impacts on existing nodes and functionality
p. 13
6.1.5
Solution Evaluation
p. 14
6.1a
Solution #1a to key issue 1a: VoLTE→CSFB
p. 15
6.1a.1
Description
p. 15
6.1a.2
Mobile Originating call flows
p. 15
6.1a.3
Mobile Terminated call flows
p. 16
6.1a.4
Impacts on existing nodes and functionality
p. 16
6.1a.5
Solution Evaluation
p. 17
6.2
Solution #2 to key issue 1: SRVCC temporary rejection
p. 17
6.2.1
Description
p. 17
6.2.2
Temporary SRVCC reject in originating phase
p. 17
6.2.3
Temporary SRVCC reject in terminating phase
p. 18
6.2.4
Impacts on existing nodes and functionality
p. 19
6.2.5
Solution Evaluation
p. 19
6.3
Solution #3: Optimised CSFB Procedure
p. 19
6.3.1
Solution Description
p. 19
6.3.2
Impacts on existing nodes and functionality
p. 19
6.3.3
Solution Evaluation
p. 20
6.4
Solution #4: UE radio capabilities consideration during PLMN and RAT
p. 20
6.4.1
Solution Description
p. 20
6.4.2
Impacts on existing nodes and functionality
p. 21
6.4.3
Solution evaluation
p. 21
6.5
Solution #5: Enabling provisioning of target cell(s) system information
p. 21
6.5.1
Solution Description
p. 21
6.5.2
Impacts on existing nodes and functionality
p. 21
6.5.3
Solution evaluation
p. 22
6.6
Solution #6 to key issue 1: Retry in CS domain
p. 22
6.6.1
Description
p. 22
6.6.2
MSC Retry in terminating phase
p. 22
6.6.3
MSC Retry in originating phase
p. 23
6.6.4
UE Retry in originating phase
p. 24
6.6.5
Impacts on existing nodes and functionality
p. 25
6.6.6
Solution Evaluation
p. 26
7
Overall Evaluation
p. 26
8
Conclusions
p. 29
$
Change History
p. 30