Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 23.139
Word version: 18.0.0
1…
4…
7…
7
Functional Description and Procedures for Fixed Broadband Access network over S2b
8
Functional Description and Procedures for Fixed Broadband Access network over S2c
9
Functional Description and Procedures for Fixed Broadband Access network using H(e)NB
$
Change history
7
Functional Description and Procedures for Fixed Broadband Access network over S2b
p. 37
7.1
General
p. 37
7.2
Initial Attach
p. 37
7.3
UE/ePDG-initiated Detach Procedure and UE-Requested PDN Disconnection
p. 39
7.4
HSS/AAA-initiated Detach Procedure
p. 40
7.5
UE-initiated Connectivity to Additional PDN
p. 41
7.6
Network-Initiated Dynamic PCC for EPC-routed Traffic
p. 41
7.7
Network-Initiated Dynamic PCC for NS-WLAN offloaded traffic
p. 42
7.8
PDN GW initiated Resource Allocation Deactivation
p. 43
7.9
Handover from 3GPP Access to Fixed Broadband Access with GTP or PMIPv6 on S2b
p. 44
7.10
Handover from Fixed broadband Access with GTP or PMIPv6 on S2b to 3GPP Access
p. 46
7.11
IPSec tunnel modified
p. 47
8
Functional Description and Procedures for Fixed Broadband Access network over S2c
p. 48
8.1
Introduction
p. 48
8.2
Procedures for trusted Fixed Broadband Access network over S2c
p. 48
8.2.1
Initial Attach with DSMIPv6 on S2c to trusted Fixed Broadband Access
p. 48
8.2.2
UE-initiated Detach Procedure and UE-Requested PDN Disconnection with DSMIPv6 on S2c in trusted Fixed Broadband Access
p. 49
8.2.3
HSS-initiated Detach Procedure with DSMIPv6 on S2c in trusted Fixed Broadband Access
p. 50
8.2.4
PDN GW-initiated PDN disconnection Procedure with DSMIPv6 on S2c in trusted Fixed Broadband Access
p. 52
8.2.5
E-UTRAN to Trusted Fixed Broadband Access Handover with DSMIPv6 on S2c
p. 52
8.2.6
Handover from Trusted Fixed Broadband Access with DSMIPv6 over S2c to 3GPP Access
p. 54
8.2.7
Network-Initiated Dynamic PCC for DSMIPV6 on S2c when accessing trusted Fixed Broadband Access for EPC-routed Traffic
p. 54
8.2.8
Network-Initiated Dynamic PCC for DSMIPV6 on S2c when accessing trusted Fixed Broadband Access for NS-WLAN offloaded Traffic
p. 55
8.2.9
UE-Initiated Connectivity to Additional PDN with DSMIPv6 on S2c over trusted Fixed Broadband Access
p. 55
8.2.10
Activation of enhanced security for S2c
p. 56
8.2.11
UE local IP address update on S2c over trusted Fixed Broadband Access
p. 57
8.3
Procedures for untrusted Fixed Broadband Access network over S2c
p. 58
8.3.1
Initial Attach with DSMIPv6 on S2c to untrusted Fixed Broadband Access
p. 58
8.3.2
UE-initiated Detach Procedure and UE-Requested PDN Disconnection with DSMIPv6 on S2c in untrusted Fixed Broadband Access
p. 59
8.3.3
HSS-initiated Detach Procedure with DSMIPv6 on S2c in untrusted Fixed Broadband Access
p. 60
8.3.4
PDN GW-initiated PDN disconnection Procedure with DSMIPv6 on S2c in untrusted Fixed Broadband Access
p. 60
8.3.5
E-UTRAN to untrusted Fixed Broadband Access Handover with DSMIPv6 on S2c
p. 61
8.3.6
Handover from Untrusted Fixed Broadband Access with DSMIPv6 over S2c to 3GPP Access
p. 63
8.3.7
Network-Initiated Dynamic PCC for S2c when accessing untrusted Fixed Broadband Access for EPC-routed Traffic
p. 63
8.3.8
Network-Initiated Dynamic PCC for S2c when accessing untrusted Fixed Broadband Access for NS-WLAN offloaded Traffic
p. 64
8.3.9
UE-Initiated Connectivity to Additional PDN with DSMIPv6 on S2c over untrusted Fixed Broadband Access
p. 64
8.3.10
IPSec tunnel modified on S2c over untrusted Fixed Broadband Access
p. 65
9
Functional Description and Procedures for Fixed Broadband Access network using H(e)NB
p. 66
9.1
Procedures for Fixed Broadband Access network using HeNB
p. 66
9.1.1
E-UTRAN Initial Attach and UE requested PDN connection Establishment
p. 66
9.1.2
Detach procedure for E-UTRAN
p. 68
9.1.3
Network initiated bearer activation, modification and deactivation
p. 68
9.1.4
UE requested bearer resource modification
p. 69
9.1.5
Service Request and Handover Procedures
p. 70
9.2
Procedures for Fixed Broadband Access network using HeNB - PMIP
p. 72
9.2.1
Initial E-UTRAN Attach with PMIP-based S5/S8
p. 72
9.2.2
Detach for PMIP-based S5/S8
p. 73
9.2.3
Dedicated Bearer Procedures for E-UTRAN Access with PMIP-based S5/S8
p. 74
9.2.4
HSS-Initiated Subscribed QoS Modification
p. 74
9.2.5
MME-initiated Dedicated Bearer Deactivation
p. 75
9.2.6
UE-initiated Resource Request and Release
p. 76
9.2.7
UE requested PDN connectivity
p. 76
9.2.8
Service Request and Handover Procedures
p. 78
9.3
Procedures for Fixed Broadband Access network using HNB for PS services
p. 79
9.3.1
PDP Context Activation
p. 79
9.3.2
Secondary PDP Context Activation and PDP Context Modification Procedure
p. 80
9.3.3
Detach, PDP Context and EPS-Bearer Deactivation Procedures
p. 81
9.3.4
Service Request and Handover Procedures
p. 82
9.4
3GPP HNB procedure - CS support
p. 83
9.4.0
General
p. 83
9.4.1
S15 session establishment at HNB registration
p. 84
9.4.2
HNB GW initiated S15 session modification
p. 84
9.4.3
S15 session termination
p. 86
9.4.4
PCRF initiated S15 session modification
p. 87
$
Change history
p. 88