Tech-invite3GPPspecsGlossariesIETFRFCsGroupsSIPABNFs   Ti+   SearchTech-invite World Map Symbol
Top
all figures have been reproduced; each entry links to the figure within the Table of Contents


Here   Top   Prev   Next
[001]  Figure 4.2.1-1
Non-roaming architecture for 3GPP accesses
[002]  Figure 4.2.1-2
Non-roaming architecture for 3GPP accesses. Single gateway configuration option
[003]  Figure 4.2.2-1
Roaming architecture for 3GPP accesses. Home routed traffic
[004]  Figure 4.2.2-2
Roaming architecture for local breakout, with home operator's application functions only
[005]  Figure 4.2.2-3
Roaming architecture for local breakout, with visited operator's application functions only
Here   Top   Prev   Next
[006]  Figure 4.3.20.1-1
Relaying Architecture
[007]  Figure 4.3.20.2-1
RN attach procedure
[008]  Figure 4.3.20.3-1
DeNB-initiated bearer activation/modification procedure
[009]  Figure 4.3.21.3-1
Core Network assisted eNodeB parameters tuning
[010]  Figure 4.4.9-1
Architecture for LIPA or SIPTO at the Local Network with L-GW collocated with the HeNB
[011]  Figure 4.4.11-1
CSS connected to MME
[012]  Figure 4.4.12-1
RCAF connected to MME
Here   Top   Prev   Next
[013]  Figure 4.6.4-1
EMM state model in UE
[014]  Figure 4.6.4-2
EMM state model in MME
[015]  Figure 4.6.4-3
ECM state model in UE
[016]  Figure 4.6.4-4
ECM state model in MME
[017]  Figure 4.7.2.2-1
Two Unicast EPS bearers (GTP-based S5/S8)
Here   Top   Prev   Next
[018]  Figure 5.1.1.2-1
Control Plane for S1-MME Interface
[019]  Figure 5.1.1.3-1
Control Plane UE - MME
[020]  Figure 5.1.1.4-1
Control Plane for S3 Interface
[021]  Figure 5.1.1.5-1
Control Plane for S4 interface
[022]  Figure 5.1.1.6-1
Control Plane for S5 and S8 interfaces
[023]  Figure 5.1.1.7-1
Control Plane for S10 interface
[024]  Figure 5.1.1.8-1
Control Plane for S11 interface
[025]  Figure 5.1.1.9-1
Control Plane for S6a interface
[026]  Figure 5.1.1.10-1
Control Plane for S13 interface
[027]  Figure 5.1.1.12-1
Control Plane for S7a interface
[028]  Figure 5.1.1.13-1
Control Plane for Nq interface
Here   Top   Prev   Next
[029]  Figure 5.1.2.1-1
User Plane for UE - P-GW
[030]  Figure 5.1.2.2-1
User Plane for eNodeB - S-GW
[031]  Figure 5.1.2.3-1
User Plane for A/Gb mode
[032]  Figure 5.1.2.4-1
User Plane for UTRAN mode and Direct Tunnel on S12
[033]  Figure 5.1.2.5-1
User Plane for Iu mode
[034]  Figure 5.1.2.6-1
User Plane with Control Plane CIoT EPS Optimisations
Here   Top   Prev   Next
[035]  Figure 5.3.2.1-1
Attach procedure
[036]  Figure 5.3.3.1-1
Tracking Area Update procedure with Serving GW change
[037]  Figure 5.3.3.1A-1
Tracking Area Update procedure with Serving GW change and data forwarding
[038]  Figure 5.3.3.2-1
E-UTRAN Tracking Area Update without S-GW change
[039]  Figure 5.3.3.3-1
Routing Area Update with MME interaction and without S-GW change
[040]  Figure 5.3.3.6-1
Routing Area Update with MME interaction and with S-GW change
Here   Top   Prev   Next
[041]  Figure 5.3.4.1-1
UE triggered Service Request procedure
[042]  Figure 5.3.4.3-1
Network triggered Service Request procedure
[043]  Figure 5.3.4A-1
eNodeB initiated Connection Suspend procedure
[044]  Figure 5.3.4B.2-1
MO Data transport in NAS PDU
[045]  Figure 5.3.4B.3-1
MT Data transport in NAS PDUs
[046]  Figure 5.3.4B.4-1
Establishment of S1-U bearer during Data Transport in Control Plane CIoT EPS Optimisation
[047]  Figure 5.3.5-1
S1 Release Procedure
[048]  Figure 5.3.5A-1
UE initiated Connection Resume procedure
[049]  Figure 5.3.6A-1
PDN GW Pause of charging procedure
[050]  Figure 5.3.7-1
GUTI Reallocation Procedure
Here   Top   Prev   Next
[051]  Figure 5.3.8.2.1-1
UE-Initiated Detach Procedure - UE camping on E-UTRAN
[052]  Figure 5.3.8.2.2-1
UE-Initiated Detach Procedure - UE camping on GERAN/UTRAN, ISR activated
[053]  Figure 5.3.8.3-1
MME-Initiated Detach Procedure
[054]  Figure 5.3.8.3A-1
SGSN-Initiated Detach Procedure with ISR activated
[055]  Figure 5.3.8.4-1
HSS-Initiated Detach Procedure
Here   Top   Prev   Next
[056]  Figure 5.3.9.2-1
Insert Subscriber Data procedure
[057]  Figure 5.3.9.3-1
Purge Procedure
[058]  Figure 5.3.10.4.2-1
NAS Security Mode Command Procedure
[059]  Figure 5.3.10.5-1
Identity Check Procedure
[060]  Figure 5.3.11.2-1
UE Reachability Notification Request Procedure
[061]  Figure 5.3.11.3-1
UE Activity Procedure
[062]  Figure 5.3.12-1
Update CSG Location Procedure
[063]  Figure 5.3.13.2-1
Insert CSG Subscriber Data procedure
[064]  Figure 5.3.14-1
UE Radio Capability Match Request
Here   Top   Prev   Next
[065]  Figure 5.4.1-1
Dedicated Bearer Activation Procedure
[066]  Figure 5.4.2.1-1
Bearer Modification Procedure with Bearer QoS Update
[067]  Figure 5.4.2.2-1
HSS Initiated Subscribed QoS Modification
[068]  Figure 5.4.3-1
Bearer Modification Procedure without Bearer QoS Update
[069]  Figure 5.4.4.1-1
PDN GW Initiated Bearer Deactivation
[070]  Figure 5.4.4.2-1
MME initiated Dedicated Bearer Deactivation
[071]  Figure 5.4.5-1
UE requested bearer resource modification
[072]  Figure 5.4.7-1
E-UTRAN initiated E-RAB modification procedure
[073]  Figure 5.4.8-1
E-UTRAN initiated UE context modification procedure
Here   Top   Prev   Next
[074]  Figure 5.5.1.1.2-1
X2-based handover without Serving GW relocation
[075]  Figure 5.5.1.1.3-1
X2-based handover with Serving GW relocation
[076]  Figure 5.5.1.2.2-1
S1-based handover
[077]  Figure 5.5.1.2.3-1
S1-based handover, Reject
Here   Top   Prev   Next
[078]  Figure 5.5.2.1.2-1
E-UTRAN to UTRAN Iu mode Inter RAT HO, preparation phase
[079]  Figure 5.5.2.1.3-1
E-UTRAN to UTRAN Iu mode Inter RAT HO, execution phase
[080]  Figure 5.5.2.1.4-1
E-UTRAN to UTRAN Iu mode Inter RAT HO, reject
Here   Top   Prev   Next
[081]  Figure 5.5.2.2.2-1
UTRAN Iu mode to E-UTRAN Inter RAT HO, preparation phase
[082]  Figure 5.5.2.2.3-1
UTRAN Iu mode to E-UTRAN Inter RAT HO, execution phase
[083]  Figure 5.5.2.2.4-1
UTRAN Iu mode to E-UTRAN Inter RAT HO, reject
Here   Top   Prev   Next
[084]  Figure 5.5.2.3.2-1
E-UTRAN to GERAN A/Gb Inter RAT HO, preparation phase
[085]  Figure 5.5.2.3.3-1
E-UTRAN to GERAN A/Gb mode Inter RAT HO, execution phase
[086]  Figure 5.5.2.3.4-1
E-UTRAN to GERAN A/Gb Inter RAT HO, reject
Here   Top   Prev   Next
[087]  Figure 5.5.2.4.2-1
GERAN A/Gb mode to E-UTRAN inter RAT HO, preparation phase
[088]  Figure 5.5.2.4.3-1
GERAN A/Gb mode to E-UTRAN Inter RAT HO, execution phase
[089]  Figure 5.5.2.4.4-1
GERAN A/Gb mode to E-UTRAN Inter RAT HO, reject
[090]  Figure 5.5.2.5.2-1
Inter RAT handover Cancel
Here   Top   Prev   Next
[091]  Figure 5.6.1-1
E-UTRAN to GERAN NACC basic network architecture
[092]  Figure 5.7A.3-1
RAN Secondary RAT usage data Reporting procedure
[093]  Figure 5.7A.3-2
GW Secondary RAT usage data Reporting procedure
[094]  Figure 5.9.1-1
Location Reporting Procedure
[095]  Figure 5.9.2.1-1
Notification of the ECGI, TAI and/or user CSG information changes
[096]  Figure 5.9.3-1
IMSI and APN information retrieval procedure
Here   Top   Prev   Next
[097]  Figure 5.10.2-1
UE requested PDN connectivity
[098]  Figure 5.10.3-1
UE or MME requested PDN disconnection
[099]  Figure 5.10.4-1
MME triggered Serving GW relocation
[100]  Figure 5.14.1-1
inter E-UTRAN Configuration Transfer basic network architecture
[101]  Figure 5.19.1-1
NAS Message Redirection Procedure
[102]  Figure 5.19.2-1
Attach,TAU and RAU procedure for Dedicated Core Network
[103]  Figure 5.19.3-1
MME/SGSN or HSS Initiated Dedicated Core Network Reselection
Here   Top   Prev   Next
[104]  Figure D.2.1-1
Roaming architecture for interoperation with Gn/Gp SGSN
[105]  Figure D.2.2-1
Non-roaming Architecture for interoperation with Gn/Gp SGSNs
[106]  Figure D.3.3-1
MME to 3G SGSN combined hard handover and SRNS relocation procedure
[107]  Figure D.3.4-1
3G Gn/Gp SGSN to MME combined hard handover and SRNS relocation procedure
[108]  Figure D.3.5-1
Routing Area Update procedure
[109]  Figure D.3.6-1
Gn/Gp SGSN to MME Tracking Area Update procedure
[110]  Figure D.3.7.2-1
E-UTRAN to GERAN A/Gb Inter RAT HO, preparation phase
[111]  Figure D.3.7.3-1
E-UTRAN to GERAN A/Gb mode Inter RAT HO, execution phase
[112]  Figure D.3.8.2-1
GERAN A/Gb mode to E-UTRAN inter RAT HO, preparation phase
[113]  Figure D.3.8.3-1
GERAN A/Gb mode to E-UTRAN Inter RAT HO, execution phase
Here   Top   Prev   None
[114]  Figure F.1
Dedicated bearer activation in combination with the default bearer activation at attach or UE requested PDN connectivity
[115]  Figure J.3-1
ISR Activation example
[116]  Figure J.4-1
Downlink data transfer with ISR active
[117]  Figure K.2.4-1
Example of Local EPC based IOPS operation
[118]  Figure L.2-1
Optimised EPS architecture option for CIoT - Non-roaming architecture
[119]  Figure L.3-1
Optimised EPS architecture option for CIoT - Roaming architecture