Tech-invite3GPPspecsGlossariesIETFRFCsGroupsSIPABNFsWorld Map
Top   in Index   Prev   Next

TS 29.215 (CT3)
Policy and Charging Control (PCC) over S9 reference point – Stage 3

ToC   3GPP‑Page   ETSI‑search   Help    
V15.1.0 (PDF)2018/06  89 p.
V14.3.02018/06  89 p.
V13.9.02018/06  89 p.
V12.9.02018/06  92 p.
V11.17.02018/06  87 p.
V10.9.0  2014/12  46 p.
V9.13.0  2014/06  41 p.
V8.15.0  2014/03  39 p.


Rapporteur:  Miss Fernandez, Susana
See also:  PCC-related TS/TR

This TS provides the stage 3 specification of the S9 reference point, which lies between the PCRF in the home PLMN (also known as H-PCRF) and the PCRF in the visited PLMN (also known as V-PCRF).


 

Here   Top   None   None   Next
1…   4.4…   5…   A…   A.7…   B…